This is the first of several planned phases of route placement/editing development now underway. Manual Route Editing – Preserving 45 Corners: The manual route editing algorithms have been improved to better maintain 45 degree cornering during route editing operations.
Filled vias are exported in a separate drill file and marked as IPC-4761 type VII (filled and capped) in the Gerber X2 output.
BGA) and invoke the via filling command from the right click context menu. Simply drag a selection box around the area (e.g. Resin Filled Via Support (NCVF): There is now support for resin filled vias, typically used with via-in-pad. This ensures that the uncoupled distance is minimised while also cornering in at 45 degrees, rather than at right angles. Dedicated support for testpoints throughout the software.